WJTV News Channel 12 - NC DOT: Prepare for traffic work on Bonner Bridge

NC DOT: Prepare for traffic work on Bonner Bridge

Posted: Updated:

Transportation crews are starting work on the Bonner Bridge Monday.

They will be taking samples to prepare for work following Hurricane Arthur.

To do that, only one lane of the bridge will be open during the day.

Work begins Monday and is expected to go through Thursday.

Powered by WorldNow

1820 TV Road
Jackson, MS 39204

Telephone: 601.372.6311
Fax: 804.819.5569
Email: wjtvnews@wjtv.com

Can't find something?
Powered by WorldNow
All content © Copyright 2000 - 2014 Media General Communications Holdings, LLC. A Media General Company.